Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Oct 3 - Oct 8
Reserve from the case
Ships within 48 hours · Estimated delivery Oct 3 - Oct 8
Pipework connection is via internal NPT pipe threads
wastewater from commercial buildings without discharge from toilets
5 l/h) and 25 % (maximum flow= 4
They are installed at the lower end of the suction hose and consist of strainer (mesh size 0
crn 1 5 a fgj h e hqqe 96531253 Pipework connection is via internalVertical, multistage centrifugal pump with inlet and outlet ports on same the level (inline). Pump materials in contact with the liquid are in high grade stainless steel. A cartridge shaft seal ensures high reliability, safe handling, and easy access and service. Power transmission is via a rigid split coupling. Pipe connection is via combined DIN ANSI JIS flanges. The pump is fitted with a 3 phase, fan cooled asynchronous motor.
US$ 99.00
US$ 169.00
US$ 104.50
US$ 159.00
US$ 129.00
US$ 29.90
US$ 42.00
US$ 122.50
US$ 184.00
US$ 114.50
US$ 149.00
US$ 69.00
Pay in 4 interest-free payments of $182.91 Learn more